Safety
Specification
Product specifications
Pre-installation information
Diagram showing minimum installation requirements.
Cutting templates
What's in the box
Product front
Contents:
1 x Porpoise Tap
1 x 1.0m x 6mm Insulated Water Pipe
1 x Connector Cable
1 x Earth Wire
1 x Fixings Set
1 x Porpoise Cutting Guide
1 x ProCore Unit
1 x Power Cord Set
1 x Simple-fit Ventilation Kit
Product rear
Dimensions
How-to-install video
Installation
Installation requirements
Identify a suitable location for the ProCore® undercounter unit. It should be positioned within 1.0m of the tap, and within 2.0m of suitable services connections. Ensure to allow enough space for the Simple-fit Vent Kit which must be installed with the unit. See Pre-Installation guide here for full installation requirements before proceeding with installation.
We recommend using an installation kit, which includes everything needed to complete the installation.
You will need:
- Installation kit, including water block and filter. Your kit will depend on your requirements and model. See installation kit guide here.
- Water block
- Installation Kit
- Jigsaw
- Hole saw (30mm)
- Cordless drill
- John Guest pipe cutters
- Adjustable spanner
- Side cutters
- Screwdriver
- 1L measuring jug
Section 1 - Installing a Porpoise tap system over sink
Section 2 - Installing the undercounter ProCore and Simple-Fit vent kit
This operation must only be carried out by trained staff.
Section 3 - Connecting the tap to the ProCore and commissioning the unit
*Expect dripping on hot dispense until the tank has reached temperature and initial dispense made. This will only occur on first heating cycle on initial start-up.
How to use
Tap control panel
Illuminated indicators
How to dispense water
Maintenance & cleaning
Sanitisation guide
You will need
- Measuring jug
- Protective gloves
- Hydrogen Peroxide (H202 3%) food safe sanitising solution
- Service filter cartridge
- Sanitising wipes
- Water filter
Care and maintenance of tap finish
Advanced troubleshooting
Troubleshooting
Warning flash sequences
In the event of the warning symbol flashing please see the sequences below for diagnostics.
Draining the hot tank
If you are decommissioning a unit, or descaling the hot tank you must first drain the hot tank.
To do so proceed with the following steps:
Technical information
Porpoise Chilled & Hot circuit schematic
Porpoise Chilled & Hot water pathway
Spares
ProCore exploded parts diagram
Porpoise exploded parts diagram
Safety critical spares
1.5KW Hot Tank with Expansion Tank 230v
702124
PCBA Main Control Board Assembly
720337
All-in-one Sensor Loom with KK Connectors
702878
8mm PF Solenoid Valve 24VDC
701729
Cooling Fan 24v with Loom
702558
Single Check Valve 5/16" (8mm) PF
462667
FS-16 Flow Switch
702078
PCBA Main Board Solenoid loom
702787
2 bar PRV 8mm
703144
3 Bar PRV 8mm
703125
Solenoid 3/4” BSP 8mm PF
701094